Employee Profile

Erin Beck

About

Erin

Erin is a well rounded, experienced multimedia designer specializing in print, digital, and motion graphics. Her diverse expertise spans sports-related animations, small business marketing, and the creation of visually striking event flyers and promotional materials. Erin’s portfolio showcases her ability to produce compelling, high-impact print designs that capture attention to elevate brands.

With a Bachelor of Fine Arts, as well as certificates in business and game design, Erin brings a unique graphic eye and technical proficiency to her work. Her skill set and versatile education have enabled her to lead a successful brand identity redesign and manage quarterly promotional campaigns.

Education

Bachelor of Fine Arts in Graphic Design
Certificate in Business
Certificate in Game Design

Certifications

Erin Beck

Multimedia Designer

FEATURED WORKS

Reconstruction Project

City of Milwaukee

Public involvement is a crucial aspect of transportation projects to ensure that the needs and concerns of the public are taken into account when planning, designing, and implementing transportation infrastructure.

Project Overviews

Public involvement is a crucial aspect of transportation projects in Wisconsin, as in many other places, to ensure that the needs and concerns of the public are taken into account when planning, designing and implementing transportation infrastructure. Public involvement helps build support for projects, enhance transparency and lead to better decision-making.

City of Milwaukee

Public involvement is a crucial aspect of transportation projects to ensure that the needs and concerns of the public are taken into account when planning, designing, and implementing transportation infrastructure.

I-39/90/94 Interstate Study

The primary objective of public involvement in this important study was to provide opportunities for both outreach and feedback; and ultimately, significant interaction with stakeholders and interested parties during this environmental study. The De Vor team was responsible for dissemination of timely, accurate and understandable information to over 30,000 residents, businesses, local and elected officials, and other agencies such as Native American Tribes and Environment Justice (EJ) groups within the immediate vicinity of the corridor. Outreach includes project branding, the development of print and electronic communication materials including PowerPoint presentations, fact sheets, newsletters, web content, and interactive communications to be utilized at outreach events, posted on the project website and social media sites. 

I-41 Project

The I-41 Project will reconstruct and expand 23 miles of interstate from four to six lanes between WIS 96 (Wisconsin Avenue) near Appleton and County F (Scheuring Road) in De Pere.

WIS 100 (Ryan Road)

The Wisconsin Department of Transportation (WisDOT) resurfaced approximately 3 miles of WIS 100 between 60th Street and St. Martins Road in the City of Franklin, Milwaukee County from March 2025 to November 2025. Work included removing and replacing all concrete pavement, upgrading underground storm sewer equipment, installing upgraded traffic signals at intersections, updating pavement markings and signs, and installing a multi-use path along the length of the project. WIS 100 was closed to all traffic between 60th Street and Puetz Road during reconstruction operations, and a posted detour directed motorists around the closure.

WIS 50

De Vor Communications was hired as a subconsultant to lead public involvement and outreach services during the construction phase of the WIS 50 Project in the city of Kenosha and the villages of Pleasant Prairie and Bristol in Kenosha County. The four-mile project was divided into three phases for safety in work zones and to reduce travel constraints to the traveling public. Project work included the following:

  • Expanding the roadway to a 6-lane concrete highway between 117th and 57th avenues
  • Reconstructing the existing 4-lane roadway between 57th and 43rd avenues
  • Implementing access management measures, including driveway and median modifications
  • Providing additional vehicle capacity at all intersections, including WIS 50/WIS 31 intersection to accommodate high-density traffic

REQUEST CALL BACK

We strive to keep a high standard of service that provides a healthy channel of communication between a business and their audience though public relations management and design. Use the form below to connect with one of our team members.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.